Meridian apartment zoning steers most new multifamily construction into a handful of higher-density and mixed-use areas, and almost always through a public approval process rather than by right. Combined with new road impact fees that took effect in March 2026 and a sharp drop in multifamily permits since 2023, that framework has slowed new apartment supply in Idaho’s second-largest city, which matters as much to owners of existing buildings as it does to developers.
This guide explains how Meridian’s Comprehensive Plan and Unified Development Code treat apartments, what fees a new unit carries, how many units are actually being permitted, and what Idaho’s 2026 housing laws change.
Meridian apartment zoning in a fast-growing city
Meridian is an incorporated city in Ada County and, according to the Census Bureau’s Vintage 2025 city population estimates, the second-largest city in Idaho. The bureau estimated 142,988 residents on July 1, 2025, up from 139,593 a year earlier, behind Boise at 238,429 and ahead of Nampa at 120,384. The city counted about 75,100 residents in 2010 and about 117,600 in the 2020 Census, so its population has nearly doubled in fifteen years.
Growth on that scale has kept housing, and especially apartments, at the center of local politics. Meridian’s rules reflect that: the city plans for higher-density housing in specific places, requires most apartment projects to go through public hearings, and sets detailed design standards for multifamily developments.
Idaho law sets an important boundary as well. Idaho Code Section 55-307 bars local governments from enacting or enforcing ordinances that control the amount of rent charged for private residential property. Meridian can shape where and how apartments are built, but not what they charge.
Where the comprehensive plan points higher density
Meridian’s City Council adopted its current Comprehensive Plan in 2019. The plan’s future land use map assigns each area a designation, and a few of those designations are where apartments are expected:
- High Density Residential. The city’s High Density Residential land use description calls for more than 12 dwelling units per gross acre, with apartments, duplexes and townhouses typically located near mixed-use or employment areas.
- Mixed Use Regional. Areas designated Mixed Use Regional must devote at least 10% of the development area to residential uses, at gross densities of 6 to 40 units per acre.
- Other mixed-use designations. The plan also includes neighborhood, community, non-residential and interchange mixed-use categories, each with its own expectations for housing.
The city has posted draft text changes to its mixed-use designations. According to the city, those changes do not alter the future land use map or revise the range of residential densities currently allowed. No adoption date had been posted as of this writing.
The Ten Mile Interchange plan
The Ten Mile Interchange Specific Area Plan, adopted June 19, 2007, guides development around the Ten Mile Road interchange on Interstate 84. The city describes a lifestyle-center-anchored mix of industrial, commercial and residential uses, with housing intended mostly on the second and third floors above ground-floor retail, office or light industrial space. That vertical mixed-use model is one of the clearest signals in the city’s planning of where denser residential projects are welcome.
The approval path for an apartment project
In practice, a new apartment community in Meridian usually needs more than a building permit. The city’s staff report for Delano Apartments, an 84-unit project at 3850 N. Centrepoint Way, shows the typical path: the site was zoned R-40, a high-density residential district, and the project still required a conditional use permit, which Meridian reviews through public hearings before the Planning and Zoning Commission.
The Unified Development Code also includes specific use standards for multifamily developments in Section 11-4-3-27. Those standards set minimum private open space for each unit, common open space that scales with unit size and project size, and a required number of site amenities that rises with the number of units.
For developers, these requirements add land and cost to every project. For existing owners, they mean that new competing buildings tend to arrive with a full amenity package, which raises the bar for older properties that compete on price rather than features.
How to follow a project through the process
Because most apartment projects go through public hearings, owners can see competition coming well before construction starts. A few habits make that easier:
- Read the staff report. Meridian’s staff reports, like the one prepared for Delano Apartments, summarize the zoning district, the comprehensive plan designation, the proposed unit count and comments from outside agencies.
- Note the comprehensive plan designation. A project on land designated for high-density or mixed-use development has a clearer path than one asking the city to change its plan.
- Watch for traffic and school comments. As the Blayden case below shows, road capacity and school enrollment can decide the outcome.
When projects are denied
Approval is not automatic, even on land planned for housing. In 2024, Trilogy Development proposed Blayden, a 312-unit apartment project at Black Cat Road and Chinden Boulevard. The Planning and Zoning Commission unanimously recommended denial in July 2024, and the City Council later denied it unanimously, citing traffic of about 5,200 weekday trips and school crowding, according to reporting by BoiseDev and the Idaho Statesman. The case illustrates how school capacity and road congestion weigh on apartment approvals in Meridian’s growth areas.
Fees that shape the cost of a new unit
Impact and connection fees add a predictable cost to every new apartment, and they are part of the math behind every project that does or does not get built.
City impact fees
Meridian charges development impact fees for fire, police and parks. Under the city’s fee schedule, multifamily fees are set by the building’s average unit size:
- Units averaging 1,200 square feet or less: $470 for fire, $190 for police and $1,946 for parks, or $2,606 per unit.
- Units averaging 1,201 to 1,700 square feet: $726, $294 and $3,006, or $4,026 per unit.
- Units averaging 1,701 to 2,500 square feet: $995, $402 and $4,119, or $5,516 per unit.
The city also charges water and wastewater assessment fees of $1,696 and $5,807 per equivalent residential unit, with the number of equivalent units for an apartment building set by the city’s methodology.
Road impact fees
Roads in Ada County are built and maintained by the Ada County Highway District rather than the city. ACHD adopted a new impact fee ordinance in December 2025 by a 4-1 board vote. According to the district’s announcement of the new fees, starting March 1, 2026 the fee is $2,371 per multifamily unit and $5,803 per single-family home, applied across a single countywide service area.
How the fee burden compares
ACHD’s multifamily road fee is about 41% of its single-family fee, reflecting the lower traffic generated per apartment. The city’s park fees, by contrast, make up roughly three-quarters of the city impact fee on a typical apartment, so a project with larger units pays noticeably more per door. Developers respond to that structure by weighing unit size carefully: a building of mostly one- and two-bedroom units under 1,200 square feet stays in the lowest fee band.
No school impact fees
Idaho’s impact fee statute, Idaho Code Section 67-8203, limits the governmental entities that can charge impact fees to cities, counties, countywide highway districts, fire protection districts and ambulance districts. School districts are not on that list, which is why school capacity shows up in apartment debates as a reason to deny or condition projects rather than as a fee.
Adding it up
For a 100-unit project with an average unit size under 1,200 square feet, city impact fees alone would total about $260,600, and ACHD road fees another $237,100, before water and sewer assessments. Those costs are paid up front and must be recovered through rents, which is one reason new construction in Meridian tends to target higher rents.
The construction pipeline by the numbers
The Community Planning Association of Southwest Idaho, the region’s metropolitan planning organization known as COMPASS, tracks residential permits each year. Its development monitoring reports show a steep decline in multifamily permits in Meridian:
- 2023: 794 multifamily units, 1,487 single-family units, 2,286 total new units.
- 2024: 175 multifamily units, 1,367 single-family units, 1,558 total.
- 2025: 200 multifamily units, 1,165 single-family units, 1,385 total.
Countywide, multifamily permits fell from 2,543 units in 2023 to 1,151 in 2025, according to COMPASS’s 2025 report. Meridian’s own 2026 Land Use and Development Report, using data as of April 2, 2026, counts 164 multifamily units out of 1,340 new dwelling units in 2025. The two sources count slightly differently, but both show multifamily permits running at roughly a quarter of their 2023 level.
The mix of housing has shifted as well. Multifamily units made up about 35% of all new units permitted in Meridian in 2023, but only about 11% in 2024 and 14% in 2025. Meridian’s share of the county’s multifamily permits also fell, from roughly 31% in 2023 to about 17% in 2025. In other words, the city has gone from being one of the main places apartments were being built in Ada County to a smaller contributor, while single-family construction has continued at more than 1,100 units a year.
Permits typically lead deliveries by one to two years for garden and mid-rise apartments, so the 2023 surge has been working its way through lease-up, while the smaller 2024 and 2025 permit years point to fewer new completions ahead.
Projects that show where building is happening
Several recent and pending projects show where apartment construction is concentrated:
- Delano Apartments, 84 units at 3850 N. Centrepoint Way, approved through a conditional use permit in the R-40 district and reported by the Idaho Statesman to be nearing completion in early 2026.
- The Ten Mile corridor, where the specific area plan calls for residential units above commercial space.
Infrastructure is also reshaping access. ACHD is building a new four-lane Linder Road overpass across Interstate 84, along with widening Linder Road from Franklin Road to the overpass and extending it from Overland Road. Phase 1 began in March 2025, the district said Phase 2 could start as early as June 2026, and it expects the project to be finished in late 2027. For owners near Linder Road, the construction period can mean detours and access disruptions, followed by better connectivity once the overpass opens. Better north-south connections across the interstate can make sites on both sides more attractive for housing.
State laws changing the 2026 picture
The 2026 Idaho Legislature passed several housing bills that took effect July 1, 2026. They became Session Law chapters 265, 264 and 320, respectively:
- Senate Bill 1354 addresses accessory dwelling units and was signed March 31, 2026.
- Senate Bill 1352 addresses starter-home subdivisions and was also signed March 31, 2026.
- House Bill 706, signed April 10, 2026, lets cities choose to allow single-stair apartment buildings, a design that can make small infill sites workable.
A separate proposal, House Bill 802, would have allowed multifamily housing as a matter of right in commercial zones. It was introduced on March 2, 2026 and referred to committee, but no further action was recorded, so it is not law.
For Meridian apartment owners, the practical effect of the 2026 laws is likely to be gradual. Accessory units and starter homes add rental and ownership options at the margin, and single-stair buildings depend on the city opting in. None of them changes the conditional use process that governs larger apartment projects.
What new supply means for existing buildings
Meridian’s development rules have several consequences for owners of existing apartment buildings.
Slower competition ahead
With multifamily permits down sharply since 2023, existing buildings face less new competition in the next few years than they did as the 2023 permit wave delivered. That can support occupancy and reduce the need for concessions, especially for older buildings that compete on price.
A higher replacement cost
New units carry impact fees of roughly $2,600 to $5,500 per unit at the city level and $2,371 per unit for roads, plus land, construction, amenity requirements and the time and risk of a public hearing process. When replacement cost rises, existing buildings with reasonable rents become relatively more valuable. Owners can test that effect with an apartment building value calculator, comparing their income-based value against what a new building would cost to replicate.
The amenity gap for older buildings
Because Meridian’s multifamily standards require new projects to include common open space and a set of amenities scaled to their size, the newest competitors arrive with shared open space and a package of on-site amenities. Many older and smaller buildings were built before those standards and cannot easily add them. They tend to compete on rent, location and unit size instead, which works as long as the price gap between new and older product stays wide enough to matter to renters.
Demand drivers keep pressure on housing
Regional job growth continues to support demand. According to the Idaho Department of Commerce, Micron’s announced investment of about $15 billion in Boise is expected to create roughly 2,000 direct jobs and more than 17,000 indirect jobs. Workers drawn by that expansion will need housing across the Boise metro area, which includes Meridian.
Takeaways for owners in Meridian
- Watch the future land use map. Sites designated High Density Residential or Mixed Use Regional near your building are where new competition can appear.
- Follow hearings, not just permits. Most apartment projects need a conditional use permit, so Planning and Zoning agendas give early notice before a building is permitted.
- Track COMPASS data each spring. Annual permit counts are a useful leading indicator of new supply in Meridian.
- Factor in replacement cost. Higher impact fees raise the cost of new units and support the relative value of existing ones.
- Keep an eye on state law. The 2026 housing bills are modest, but future sessions may revisit by-right multifamily in commercial zones.
To see how these trends fit the broader local market, visit our Meridian market page or explore our coverage of Idaho markets.